|
One of the truly unique features of fiberglass pools
by San Juan Products is their molded one-piece construction which enables
them to be installed in only a fraction of the time it takes to construct
and outfit a concrete pool. A typical San Juan pool can be up and running
within one to two weeks of its arrival at a home site.
When the pool excavation is completed, the excavated floor is compacted
with sand and water and graded to the contour of the pool bottom. The
one piece fiberglass pool is then set in place and filling begins. As
the pool fills with water, construction sand is water-compacted around
the outside of the pool to lock it into place.
While this process is in progress, the plumbing installation, equipment
set, and electrical connections are completed. Deck installation, yard
cleanup and pool operation instructions complete the process.
The ability of a San Juan pool to flex without losing strength is especially
important areas where the ground tends to shift. Fiberglass pools are
17 times stronger than concrete, with a tensile strength of 11,300 pounds
per square inch. This means it would take 11,300 pounds of pull to fracture
one square inch of a San Juan pool. This flexible strength allows the
pool to expand or contract with the earth without being damaged. Because
the tile trim is secured to the pool with silicone adhesive and silicone
grout, the tile will flex with the pool. The silicone grout is also
impervious to stains and algae growth.
|

|